| Fortalecimiento del CJM | ||||
| Fortalecimiento del Centro de Justicia para las Mujeres en Palenque desglosado en el catálogo de conceptos Días naturales 3 Meses. | ||||
| Descripción del concepto de obra | Total del monto a ejecutar | Septiembre | Octubre | Noviembre |
| EDIFICIO | | | | |
| Preliminares | $18,111.32 | $18,111.32 0.69% | | |
| 0.69% | ||||
| Estructura Metálica | $148,713.05 | | $148,713.05 5.65% | |
| 5.65% | ||||
| herrería Y Cancelería | $70,479.59 | | $70,479.59 2.68% | |
| 2.68% | ||||
| Instalación Eléctrica | $327,609.94 | | $163,936.54 6.23% | $163,673.40 6.22% |
| 12.45% | ||||
| Pisos Y Recubrimientos | $146,535.74 | | | $146,535.74 5.57% |
| 5.57% | ||||
| Acabados | $742,786.25 | | | $742,786.25 28.22% |
| 28.22% | ||||
| Aire acondicionado | $304,915.85 | | $152,589.47 5.80% | $152,325.38 5.79% |
| 11.59% | ||||
| jardinería | $68,630.72 | | | $68,630.72 2.61% |
| 2.61% | ||||
| OBRA EXTERIOR | ||||
| Preliminares | $48,240.97 | | $48,240.97 1.83% | |
| 1.83% | ||||
| Fortalecimiento del CJM | ||||
| Fortalecimiento del Centro de Justicia para las Mujeres en Palenque desglosado en el catálogo de conceptos: Días naturales 3 Meses. | ||||
| Descripción del concepto de obra | Total del monto a ejecutar | Septiembre | Octubre | Noviembre |
| Estructura de concreto | $104,221.70 | | $104,221.70 3.96% | |
| 3.96% | ||||
| albañilería | $168,686.97 | | $168,686.97 6.41% | |
| 6.41% | ||||
| herrería Y Cancelería | $40,209.01 | | $40,209.01 1.53% | |
| 1.53% | ||||
| Instalación Eléctrica | $189,838.53 | | $95,050.91 3.61% | $94,787.62 3.60% |
| 7.21% | ||||
| Instalación Hidro-Sanitaria | $1,542.62 | | $1,542.62 0.06% | |
| 0.06% | ||||
| Pisos Y Recubrimientos | $132,491.95 | | | $132,491.95 5.03% |
| 5.03% | ||||
| Acabados | $74,774.47 | | | $74,774.47 2.87% |
| 2.87% | ||||
| jardinería | $44,049.67 | | | $44,049.67 1.67% |
| 1.67% | ||||
| | ||||
| Total ejercido por mes | | $18,111.32 | $1,037,720.50 | $1,576,006.53 |
| Porcentaje de avance físico acumulado de la obra | | 0.69% | 39.43% | 59.88% |
| Subtotal del costo de la obra | | | $2,631,838.35 | |
| 16% IVA | | | $421,094.14 | |
| Total del costo de la obra | | | $3,052,932.49 | |
| (TRES MILLONES CINCUENTA Y DOS MIL NOVECIENTOS TREINTA Y DOS PESOS 49/100 M.N.) | ||||
| Código | Concepto | Unidad | Cantidad | P. Unitario | Importe | % |
| | EDIFICIO | | | | | |
| A11 | PRELIMINARES (EDIFICIO ) | | | | | |
| PUAPREL600 | RETIRO DE IMPERMEABILIZANTE DAÑADO EN LOSA DE AZOTEA A CUALQUIER ALTURA; INCLUYE: ACARREOS A LUGAR DE ACOPIO, LIMPIEZA DE LA SUPERFICIE, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M2 | 761.62 | $23.78 | $18,111.32 | 0.69% |
| | | | | | | |
| | TOTAL PRELIMINARES ( EDIFICIO ) | | | | $18,111.32 | 0.69% |
| | | | | | | |
| A14 | ESTRUCTURA METALICA | | | | | |
| PUAESME360 | SUMINISTRO Y COLOCACION DE ESTRUCTURA METÁLICA A BASE DE PERFIL ESTRUCTURAL PTR CUADRADO, CAL. 14. INCLUYE: ACARREOS, CORTES, ELEVACIONES, SOLDADURA, ANDAMIOS, EQUIPO PARA SOLDAR, UNA MANO DE PRIMARIO ANTICORROSIVO, DOS MANOS PINTURA ESMALTE, MATERIALES, MANO DE OBRA, HERRAMIENTAS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | KG | 623.62 | $79.03 | $49,284.69 | 1.87% |
| | | | | | | |
| PUAESME500 | SUMINISTRO, COLOCACION Y FIJACION DE CUBIERTA DE LAMINA DE POLICARBONATO DE 6 MM. COLOR BLANCO OPALINO, A UNA ALTURA MAXIMA DE 3.50 M. MONTADA SOBRE ESTRUCTURA DE CUALQUIER ALTURA, INCLUYE:PIJA AUTOTALADRANTE CABEZA HEXAGONAL TROPICALIZADA No. 10 X 1", 1/4"X1/2", RONDANA SELLADORA CON SELLO DE NEOPRENO VULCANIZADO GALVANIZADA DE 1/4"X1" DE DIAMETRO EXTERNO, CINTA NORGLAZE F-950, BLANCA, SILICON NEUTRO 791 BLANCO, HERRAMIENTA, MANO DE OBRA, ACARREOS FUERA Y DENTRO DE LA OBRA, TRABAJO TERMINADO SEGUN PROYECTO. | M2 | 69.44 | $1,431.86 | $99,428.36 | 3.78% |
| | TOTAL ESTRUCTURA METALICA ( EDIFICIO ) | | | | $148,713.05 | 5.65% |
| | | | | | | |
| A16 | HERRERIA Y CANCELERIA ( EDIFICIO ) | | | | | |
| PUAHCAN590 | SUMINISTRO Y COLOCACIÓN DE VENTANA, FABRICADA A BASE DE CONTRAMARCO CON PERFIL TUBULAR DE 1 1/2""x 3" CAL. 18 Y PERSIANAS TIPO LOUVER A BASE DE PERFIL TUBULAR DE 1"x 2" CAL.18, A CADA 6 CMS DE SEPARACIÓN, COMO SE INDICA EN PROYECTO; INCLUYE: ACARREOS, CORTES, AJUSTES, PERFORACIONES, SOLDADURA, ELEMENTOS DE ANCLAJE, UNA APLICACIÓN DE PRIMARIO ANTICORROSIVO, DOS APLICACIONES DE PINTURA ESMALTE, NIVELACION, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA LA CORRECTA EJECUCION. | M2 | 27.05 | $2,605.53 | $70,479.59 | 2.68% |
| | | | | | | |
| | TOTAL HERRERIA Y CANCELERIA ( EDIFICIO ) | | | | $70,479.59 | 2.68% |
| | | | | | | |
| | INSTALACIÓN ELÉCTRICA ( EDIFICIO ) | | | | | |
| PUAINEL1050 | SUMINISTRO Y COLOCACION DE FOTOCELDA CON BASE MCA VOLTECK, MODELO 42228 SEFO-LS; INCLUYE: ACARREO, CONEXIONES ELECTRICAS, TERMINALES ELECTRICAS PARA CABLES, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 1.00 | $398.66 | $398.66 | 0.02% |
| | | | | | | |
| PUAINEL1080 | FABRICACIÓN, COLOCACIÓN, INSTALACIÓN ELÉCTRICA E ILUMINACIÓN A BASE DE LUMINARIAS LED LUZ BLANCA MARCA SAMSUNG PARA ILUMINACIÓN ELÉCTRICA, DE LETRAS CORPÓREAS HUECAS EN ALUMINIO ANONIZADO COLOR NEGRO SEMIMATE CON LA LEYENDA "FISCALIA GENERAL DEL ESTADO DE CHIAPAS", CON MEDIDAS DE 0.20 M. DE ALTO Y GROSOR DE 2", CON LETRA DE TIPOGRAFÍA NOVECENTO WIDE BOLD COMO SE INDICA EN EL PROYECTO; INCLUYE: LETRAS CORPÓREAS, LUMINARIAS, MATERIALES, ANDAMIOS, MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. (A UNA ALTURA MÁXIMA DE 10.00 M.) | PZA | 1.00 | $27,733.35 | $27,733.35 | 1.05% |
| | | | | | | |
| PUAINEL1081 | FABRICACIÓN, COLOCACIÓN, INSTALACIÓN ELÉCTRICA E ILUMINACIÓN A BASE DE LUMINARIAS LED LUZ BLANCA MARCA SAMSUNG PARA ILUMINACIÓN ELÉCTRICA, DE LETRAS CORPÓREAS HUECAS EN ALUMINIO ANONIZADO COLOR NEGRO SEMIMATE CON LA LEYENDA "CENTRO DE JUSTICIA PARA LAS MUJERES", CON MEDIDAS DE 0.25 M. DE ALTO Y GROSOR DE 2", CON LETRA DE TIPOGRAFÍA NOVECENTO WIDE BOLD COMO SE INDICA EN EL PROYECTO; INCLUYE: LETRAS CORPÓREAS, LUMINARIAS, MATERIALES, ANDAMIOS, MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. (A UNA ALTURA MÁXIMA DE 10.00 M.) | PZA | 1.00 | $23,739.14 | $23,739.14 | 0.90% |
| | | | | | | |
| PUAINEL1082 | FABRICACIÓN, COLOCACIÓN, INSTALACIÓN ELÉCTRICA E ILUMINACIÓN A BASE DE LUMINARIAS LED LUZ BLANCA MARCA SAMSUNG PARA ILUMINACIÓN ELÉCTRICA, DE CAJA DE LUZ CORPÓREA, CON LA LEYENDA CERO IMPUNIDAD, LA PALABRA "CERO" ANONIZADO COLOR ROJO CODIGO PANTONE P56-16C, PARA LA PALABRA "IMPUNIDAD" ANONIZADO COLOR NEGRO SEMI MATE, CON LETRA DE TIPOGRAFÍA NOVECENTO WIDE BOLD, CON UN DESARROLLO TOTAL DE 2.30 DE LARGO X 0.20 DE ALTO Y UN GROSOR DE 2", PARA CAJA DE LUZ COMO SE INDICA EN EL PROYECTO; INCLUYE: CAJA DE LUZ, LUMINARIAS, MATERIALES, ANDAMIOS, MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. (A UNA ALTURA MÁXIMA DE 10.00 M.) | LOTE | 1.00 | $12,204.08 | $12,204.08 | 0.46% |
| | | | | | | |
| PUAINEL1083 | FABRICACIÓN, COLOCACIÓN, INSTALACIÓN ELÉCTRICA E ILUMINACIÓN A BASE DE LUMINARIAS LED LUZ BLANCA MARCA SAMSUNG PARA ILUMINACIÓN ELÉCTRICA, DE CAJA DE LUZ CORPÓREA, CON EL EMBLEMA DE LA FISCALÍA GENERAL DEL ESTADO DE CHIAPAS, ANONIZADO COLOR ROSA CODIGO PANTONE P69- 70C Y VERDE CODIGO PANTONE P131-6C, CON MEDIDAS DE 0.70 M. DE ANCHO X 0.40 M. Y UN GROSOR DE 2" PARA CAJA DE LUZ COMO SE INDICA EN EL PROYECTO; INCLUYE: CAJA DE LUZ, LUMINARIAS, MATERIALES, ANDAMIOS, MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. (A UNA ALTURA MÁXIMA DE 10.00 M.) | PZA | 1.00 | $7,428.58 | $7,428.58 | 0.28% |
| PUAINEL1084 | FABRICACIÓN, COLOCACIÓN, INSTALACIÓN ELÉCTRICA E ILUMINACIÓN A BASE DE LUMINARIAS LED LUZ BLANCA MARCA SAMSUNG PARA ILUMINACIÓN ELÉCTRICA, DE CAJA DE LUZ CORPÓREA, CON EL EMBLEMA DE HUMANISMO QUE TRANSFORMA, GOBIERNO DE CHIAPAS 2024 - 2030 ANONIZADO COLOR ROSA CODIGO PANTONE P69- 70C Y VERDE CODIGO PANTONE P131-6C, CON MEDIDAS DE 0.40 M. X 0.50 M, CON LETRA DE TIPOGRAFÍA NOVECENTO WIDE BOLD Y UN GROSOR DE 2" PARA CAJA DE LUZ COMO SE INDICA EN EL PROYECTO; INCLUYE: CAJA DE LUZ, LUMINARIAS, MATERIALES, ANDAMIOS, MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. (A UNA ALTURA MÁXIMA DE 10.00 M.) | PZA | 1.00 | $5,306.13 | $5,306.13 | 0.20% |
| | | | | | | |
| PUAINEL3005 | SUMINISTRO, INSTALACIÓN Y COLOCACION DE NODOS DE VOZ, DATOS Y WIFI; INCLUYE: ACARREOS, CABLES, CONECTORES DE RED, PLACAS, ELEMENTOS DE FIJACIÓN, CONEXIONES MECANICAS, PRUEBAS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 60.00 | $2,450.00 | $147,000.00 | 5.59% |
| | | | | | | |
| PUAINEL3010 | SUMINISTRO E INSTALACION DE UPS DE 1500VA, PARA PROPORCIONAR ENERGIA ELECTRICA A DISPOSITIVOS DE REDES EN CASO DE UN CORTE DE ENERGÍA; INCLUYE: ACARREOS, COLOCACION, CONEXIONES, PRUEBAS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 1.00 | $14,800.00 | $14,800.00 | 0.56% |
| | | | | | | |
| PUAINEL3015 | SUMINISTRO, INSTALACION Y COLOCACIÓN DE SWITCH DE RED O CONMUTADOR, PARA INTERCONECTAR MULTIPLES DISPOSITIVOS EN UNA RED Y PERMITIR LA COMUNICACION ENTRE ELLOS; INCLUYE: ACARREOS, COLOCACION, CONEXIONES, PRUEBAS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 3.00 | $10,466.66 | $31,399.98 | 1.19% |
| | | | | | | |
| PUAINEL3020 | SUMINISTRO, INSTALACIÓN Y COLOCACION DE RACK DE 12U CON PDU Y ORGANIZADORES; INCLUYE: ACARREOS, ELEVACIONES, MANIOBRAS DE COLOCACION, ELEMENTOS DE FIJACIÓN, CONEXIONES, PRUEBAS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 1.00 | $15,600.02 | $15,600.02 | 0.59% |
| PUAINEL3025 | SUMINISTRO, INSTALACIÓN Y COLOCACION DE EQUIPOS INALAMBRICOS; INCLUYE: ACARREOS, ELEVACIONES, MANIOBRAS DE COLOCACION, ELEMENTOS DE FIJACIÓN, CONEXIONES, PRUEBAS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 10.00 | $4,200.00 | $42,000.00 | 1.60% |
| | | | | | | |
| | TOTAL INSTALACIÓN ELÉCTRICA ( EDIFICIO ) | | | | $327,609.94 | 12.45% |
| | | | | | | |
| A19 | PISOS Y RECUBRIMIENTOS ( EDIFICIO ) | | | | | |
| PUAPIRE068 | FIRME DE CONCRETO SIMPLE F'c=150 KG/CM2 DE 10 CMS. DDE ESPESOR AACABADO RUSTICO LOSAS 3.06 X 2.00 METROS, JUNTAS FRIAS ACABADOS CON VOLTEADOR Y ELABORADO CON REVOLVEDORA; INCLUYE: ACARREO, NIVELACION, COLADO, CURADO, CIMBRADO, DESCIMBRADO CON MADERA DE PINO DE TERCERA, HERRAMIENTA, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M2 | 45.12 | $442.54 | $19,967.40 | 0.76% |
| | | | | | | |
| PUAPIRE135 | SUMINISTRO Y COLOCACION DE ZOCLO DE MADERA, DE 8 CM DE ANCHO Y 2.0 CM DE ESPESOR, ACABADO BARNIZADO COLOR NOGAL CLASICO; INCLUYE: ACARREOS, CORTE 45° Y 90°, AJUSTES, TORNILLERIA, LIJADO, TRES APLICACIONES DE BARNIZ ENTINTADO, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA LA CORRECTA COLOCACION. | M | 576.69 | $167.50 | $96,595.58 | 3.67% |
| | | | | | | |
| PUAPIRE300 | SUMINISTRO Y COLOCACION DE RECUBRIMIENTO DE PIEDRA LAJA, SOBRE PISO DE CONCRETO, ASENTADO CON ADHESIVO MODIFICADO CON RESINAS PEGAVITRO; INCLUYE: ACARREOS, CORTES, AJUSTES, DESPERDICIOS, NIVELACIÓN, EMBOQUILLADO, MATERIALES, HERRAMIENTAS, MANO DE OBRA, LIMPIEZA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M | 45.12 | $664.29 | $29,972.76 | 1.14% |
| | TOTAL PISOS Y RECUBRIMIENTOS ( EDIFICIO ) | | | | $146,535.74 | 5.57% |
| | | | | | | |
| A21 | ACABADOS ( EDIFICIO ) | | | | | |
| PUAACAB080 | ENTORTADO EN AZOTEA CON MORTERO CEMENTO-ARENA 1:5, CON UN ESPESOR PROMEDIO DE 6 CM; INCLUYE: ACARREOS, PREPARACION DEL AREA, DESNIVELES, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M2 | 712.50 | $217.32 | $154,840.50 | 5.88% |
| | | | | | | |
| PUAACAB125 | SUMINISTRO Y APLICACIÓN DE PINTURA VINILICA-ACRILICA, SOLIDOS POR VOLUMEN 33%, VISCOSIDAD 95 K, 3000 CICLOS DE LAVADO, EN MUROS APLANADO ACABADO ESPONJEADO, MUROS DE TABLAROCA Y PLAFONES DE CONCRETO, A UNA ALTURA DE 0,00 A 3,50 M; INCLUYE: ACARREOS, PREPARACION DE LA SUPERFICIE, UNA APLICACION DE SELLADOR VINÍLICO 5x1, DOS APLICACIONES DE PINTURA, LIMPIEZA, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA APLICACION. | M2 | 2474.00 | $111.49 | $275,826.26 | 10.48% |
| | | | | | | |
| PUAACAB470 | SUMINISTRO Y APLICACIÓN DE SISTEMA IMPERMEABLE PREFABRICADO EN LOSA DE AZOTEA; ELABORADO CON ASFALTO MODIFICADO DE 4,0 MM DE ESPESOR, REFORZADO CON MEMBRANA DE POLIESTER, ACABADO APARENTE CON GRAVILLA DE REOLITA COLOR TERRACOTA. EL ACABADO FINAL DE LA SUPERFICIE DEBERÁ SER HOMOGENEA SIN PRESENCIA DE ESPEJOS DE ASFALTO; INCLUYE: PROPORCION DEL AREA, ACARREOS, IMPRIMACION CON COMPUESTO ASFALTICO SIN DILUIR, ELEVACIONES DE MATERIALES HASTA EL LUGAR DE UTILIZACION, TRASLAPES MINIMOS DE 10 CM, EQUIPO TERMOFUSIÓN Y GAS BUTANO, MATERIALES, MANO DE OBRA ESPECIALIZADA, HERRAMIENTAS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M2 | 761.62 | $409.81 | $312,119.49 | 11.86% |
| | TOTAL ACABADOS ( EDIFICIO ) | | | | $742,786.25 | 28.22% |
| A22 | AIRE ACONDICIONADO ( EDIFICIO ) | | | | | |
| PUAACON032 | SUMINISTRO Y COLOCACION DE EQUIPO DE AIRE ACONDICIONADO TIPO MINI-SPLIT, MARCA PRIME, MPRC242-E2, DE CAPACIDAD NOMINAL 24,000 BTU/HR, 220 VOLTS, HIWALL, AUTO APAGADO Y AUTO ENCENDIDO, INSTALADO CON KIT BASICO; INCLUYE: ACARREO VERTICALES, MANIOBRAS DE INSTALACION, CONEXIONES MECANICAS, PRUEBAS, MATERIALES, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 1.00 | $14,045.90 | $14,045.90 | 0.53% |
| | | | | | | |
| PUAACON051 | SUMINISTRO Y COLOCACION DE EQUIPO DE AIRE ACONDICIONADO TIPO MINI-SPLIT, MARCA PRIME, MPRC122-E2, DE CAPACIDAD NOMINAL 12,000 BTU/HR, 220 VOLTS, HIWALL, AUTO APAGADO Y AUTO ENCENDIDO, INSTALADO CON KIT BASICO; INCLUYE: ACARREO VERTICALES, MANIOBRAS DE INSTALACION, CONEXIONES MECANICAS, PRUEBAS, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 30.00 | $7,652.50 | $229,575.00 | 8.72% |
| | | | | | | |
| PUAACON227 | SUMINISTRO Y COLOCACION DE SUPRESOR DE ALTO VOLTAJE PARA CENTROS DE CARGA, TRIFASICO MODELO SPV-IND-3000 (50 KA), VOLTAJE NOMINAL 110/190 V-277/480 V, CONFIGURACION ESTRELLA 3 F-N Y T, MARCA INDUSTRONIC; INCLUYE: ACARREO, CONEXIÓN ELECTRICAS, PRUEBAS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 1.00 | $9,490.84 | $9,490.84 | 0.36% |
| | | | | | | |
| PUAACON410 | SUMINISTRO Y COLOCACION DE TUBO FLEXIBLE DE ACERO LICUATITE 19 MM. DE DIAMETRO, CON CUBIERTA DE PVC; INCLUYE: ACARREO, AJUSTES, CONECTORES PARA EXTERIOR, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M | 46.50 | $132.45 | $6,158.93 | 0.23% |
| | | | | | | |
| PUAACON765 | SUMINISTRO Y COLOCACION DE CORDON USO RUDO TIPO ST 600 VOLTS, CALIBRE 3 X 10, MARCA CONDUMEX, LATINCASA Y CONDUCTORES MONTERREY; INCLUYE: ACARREO, TENDIDO, CORTES, CONEXIONES ELECTRICAS, TERMINALES ELECTRICAS PARA CABLES, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | M | 46.50 | $207.09 | $9,629.69 | 0.37% |
| | | | | | | |
| PUAACON1185 | SUMINISTRO, FABRICACION Y COLOCACIÓN DE BASE METALICA PARA CONDENSADORES EN PISO, DE 0.75x0.35x0.15 M. DE ALTURA, A BASE DE ANGULO DE ACERO 1 1/2"x 3/16" REFUERZOS INTERMEDIOS DE SOLERA METALICA @ 4 CM. DE 1 1/2"x 1/8" , CUATRO BASES DE PTR CUADRADO DE 1 1/2" CAL.14; INCLUYE: ACARREOS, CORTES, SOLDADURA, UNA APLICACION DE PRIMARIO AANTICORROSIVO, DOSAPLICACIONES DE PINTURA ESMALTE, TORNILLERIA, MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | PZA | 31.00 | $1,161.79 | $36,015.49 | 1.37% |
| | TOTAL AIRE ACONDICIONADO ( EDIFICIO ) | | | | $304,915.85 | 11.59% |
| A23 | JARDINERIA (EDIFICIO ) | | | | | |
| PUAJARD027 | SUMINISTRO Y COLOCACION DE PLANTA DE ORNATO TIPO IXORA REYNA NATURAL DE 65 CM METROS DE ALTURA APROX.; INCLUYE: ACARREO, PLANTADO, RIEGO DIARIO, HASTA LA TOTAL ADAPTACION DE LA PLANTA, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 60.00 | $293.17 | $17,590.20 | 0.67% |
| | | | | | | |
| PUAJARD028 | SUMINISTRO Y COLOCACION DE PLANTA DE ORNATO TIPO PALMA ARECA DE 1.20 METROS DE ALTURA APROX.; INCLUYE: ACARREO, PLANTADO, RIEGO DIARIO, HASTA LA TOTAL ADAPTACION DE LA PLANTA, TIERRA VEGETAL, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 6.00 | $462.05 | $2,772.30 | 0.11% |
| | | | | | | |
| PUAJARD501 | SUMINISTRO Y COLOCACION DE MACETA CONIFORME PARA PLANTA, HECHA DE POLIETILENO ROTOMOLDEADO, 55 CM DE DIAMETRO Y 60 CM DE ALTURA, MODELO VIOLETA 55, COLOR BRONCE; INCLUYE: ACARREO, ELEVACIONES, MANIOBRAS DE COLOCACION, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA PLANTACION. | PZA | 6.00 | $1,799.57 | $10,797.42 | 0.41% |
| | | | | | | |
| PUAJARD505 | SUMINISTRO Y COLOCACION DE MACETA RECTANGULAR PARA PLANTA, HECHA DE POLIETILENO ROTOMOLDEADO, 80x38x38 CM, MODELO JACARANDA 80, COLOR BRONCE; INCLUYE: ACARREO, ELEVACIONES, MANIOBRAS DE COLOCACION, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA PLANTACION. | PZA | 20.00 | $1,873.54 | $37,470.80 | 1.42% |
| | TOTAL JARDINERIA (EDIFICIO ) | | | | $68,630.72 | 2.61% |
| | | | SUBTOTAL EDIFICIO | | $1,827,782.46 | 69.45% |
| | | | | | | |
| | OBRA EXTERIOR | | | | | |
| A11 | PRELIMINARES (OBRA EXTERIOR) | | | | | |
| PUAPREL055 | EXCAVACIÓN A MANO EN TERRENO TIPO "B" DE 0.00 A 2.00 METROS DE PROFUNDIDAD SECCIÓN OBLIGADA; INCLUYE: ACARREOS, AFINES DE TALUDES, TRASPALEOS, AFINES DE FONDO, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M3 | 33.53 | $237.79 | $7,973.10 | 0.30% |
| | | | | | | |
| PUAPREL110 | RELLENO DE EXCAVACIONES CON MATERIAL MEJORADO DE BANCO, PARA ESTRUCTURAS Y/O PARA ALCANZAR NIVELES DE PROYECTO, EN CAPAS DE 20 CMS DE ESPESOR, COMPACTADAS CON EQUIPO VIBRATORIO MANUAL O EQUIPO SIMILAR, AL 95% SEGUN PRUEBA PROCTOR, PREVIA LA INCORPORACION DEL AGUA NECESARIA, INCLUYE: ACARREOS, SUMINISTRO Y EXTENDIDO DEL MATERIAL, HERRAMIENTAS, MANO DE OBRAY TODO LO NECESARIO MPARA LA CORRECTA EJECUCION. | M3 | 74.91 | $537.55 | $40,267.87 | 1.53% |
| | TOTAL PRELIMINARES (OBRA EXTERIOR) | | | | $48,240.97 | 1.83% |
| | | | | | | |
| A15 | ESTRUCTURA DE CONCRETO (OBRA EXTERIOR) | | | | | |
| PUAESCO220 | CONCRETO F c=150KG/CM2 EN GUARNICIONES CON SECCIÓN DE 15 X 20 X 45 CMS. CON CEMENTO NNORMAL, TAMAÑOMÁXIMO DE AGREGADO 3/4" , ELABORADO EN OBRA CON REVOLVEDORA, VIBRADOR; INCLUYE: ACARREOS, COLADO, VIBRADO, CURADO, CIMBRADO, DESCIMBRADO, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M | 217.70 | $478.74 | $104,221.70 | 3.96% |
| | | | | | | |
| | TOTAL, ESTRUCUTRA DE CONCRETO (OBRA EXTERIOR) | | | $104,221.70 | 3.96% | |
| | | | | | | |
| A15 | ALBAÑILERIA ( OBRA EXTERIOR) | | | | | |
| PUAALBA050 | MURO DE 15Cm. ESP. DE BLOCK HUECO 15x20x40Cm. ASENTADO CON MORTERO CEM-ARENA 1:4. ACABADO COMUN, HASTA UNA ALTURA DE 0 A 3 M. INCLUYE: ACARREOS, ELEVACIONES, DESPERDICIOS, LIMPIEZA, ANDAMIOS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M2 | 72.48 | $474.97 | $34,425.83 | 1.31% |
| | | | | | | |
| PUAALBA105 | CADENA O CASTILLO DE CONCRETO F'C = 150 KG/CM2. DE 15 X 15 CMS. ARMADO CON ARMEX Y CIMBRA DE MADERA DE PINO DE 3A; INCLUYE: HABILITADO, CIMBRADO, DESCIMBRADO, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M | 212.00 | $306.78 | $65,037.36 | 2.47% |
| | | | | | | |
| PUAALBA115 | CADENA DE CONCRETO F'C = 150 KG/CM2. DE 15 X 20 CMS. ARMADO CON ARMEX Y CIMBRA DE MADERA DE PINO DE 3A; INCLUYE: HABILITADO, CIMBRADO, DESCIMBRADO, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M | 163.20 | $349.23 | $56,994.34 | 2.17% |
| | | | | | | |
| PUAALBA273 | ELABORACION DE CANAL PLUVIAL A BASE DE DOS MUROS DE CONCRETO F'C=250 KG/CM2 T.M.A. 3/4" DE 10 CM DE ESP. Y 60 CM DE ALTURA, ARMADO CON VAS. DEL N° 3 @ 15 CMS. AMBOS SENTIDOS; UN FIRME DE CONCRETO F'C=250 KG/CM2 T.M.A. 3/4" DE 10 CM DE ESP. DE 0.50 M DE ANCHO, ARMADA CON VAS. DEL N° 3 @ 15 CM AMBOS SENTIDOS; ACABADOS INTERIORES PULIDO; INCLUYE: EXCAVACION, AFINE DE TALUDES, ACARREOS DE MATERIALES PRODUCTO DE EXCAVACIONES A 1A. ESTACION, HABILITADO, CORTES, CIMBRA Y DESCIMBRA, PREPARACION DE LA SUPERFICIE, MATERIALES, HERRAMIENTA, MANO DE OBRA Y TODO LO NECESARIO PARA LA CORRECTA EJECUCION. | M | 7.85 | $1,557.89 | $12,229.44 | 0.46% |
| | TOTAL, ALBAÑILERIA (OBRA EXTERIOR ) | | | | $168,686.97 | 6.41% |
| | | | | | | |
| A16 | HERRERIA Y CANCELERIA (OBRA EXTERIOR) | | | | | |
| PUAHCAN200 | SUMINISTRO, HABILITADO Y COLOCACION DE REJILLA TIPO IRVING DE 30 CM DE ANCHO, A BASE DE ANGULO DE ACERO DE 1 1/4"x 1 1/4", SOLERA DE 1"x1/8" @ 1.6 CM Y CONTRAMARCO CON ANGULO DE ACERO DE 1 1/2"x1 1/2", ACENTADO SOBRE CANAL PLUVIAL; INCLUYE: ACARREOS, CORTE, SOLDADURA, PRIMARIO ANTICORROSIVO, PINTURA ESMALTE, NIVELACION, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA LA CORRECTA EJECUCION. | M | 7.85 | $1,719.00 | $13,494.15 | 0.51% |
| | | | | | | |
| PUAHCAN847 | SUMINISTRO, FABRICACION Y COLOCACIÓN DE BANCA METALICA, EMPOTRADA EN JARDINERAS DE 0.45x0.50 M. DE ALTURA, A BASE DE PTR DE 3"x2" CAL 14 Y CUATRO BASES DE PTR CUADRADO DE 2" CAL.14; INCLUYE: ACARREOS, CORTES, SOLDADURA, UNA APLICACION DE PRIMARIO ANTICORROSIVO, DOS APLICACIONES DE PINTURA ESMALTE, TORNILLERIA, MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | M | 30.93 | $863.72 | $26,714.86 | 1.02% |
| | TOTAL HERRERIA Y CANCELERIA ( OBRA EXTERIOR ) | | | $40,209.01 | 1.53% | |
| | | | | | | |
| A17 | INSTALACIÓN ELÉCTRICA ( OBRA EXTERIOR ) | | | | | |
| PUAINEL020 | SUMINISTRO Y COLOCACION DE FOTOCONTACTOR, 2x30 A. 220 V. MODELO 5404-S, MARCA TORK; INCLUYE: ACARREOS, FOTOCELDAS CON BASE, INSTALACION, CONEXIONES ELECTRICAS, PRUEBAS, MATERIALES DE FIJACION, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTO FUNCIONAMIENTO. | PZA | 1.00 | $2,918.95 | $2,918.95 | 0.11% |
| | | | | | | |
| PUAINEL059 | SUMINISTRO Y COLOCACIÓN DE REGISTRO ELÉCTRICO PREFABRICADO DE CONCRETO DE 0.30x0.30x0.40 M. CON TAPA DE CONCRETO Y MARCO DE ANGULO DE ACERO, PARA ALUMBRADO; INCLUYE: ACARREOS, MANIOBRAS DE COLOCACION, NIVELACION, CONEXIONES DE TUBERIAS, EXCAVACION, RELLENO CON MATERIAL DE EXCAVACION, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | PZA | 5.00 | $1,350.10 | $6,750.50 | 0.26% |
| | | | | | | |
| PUAINEL135 | SUMINISTRO Y COLOCACION DE INTERRUPTOR TERMOMAGNETICO TIPO I-LINE, 2 POLOS DE 20 AMPER'S, MARCA SQUARED'S; INCLUYE: ACARREO, CONEXIÓN ELECTRICA, PRUEBA NECESARIAS, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 1.00 | $8,009.26 | $8,009.26 | 0.30% |
| | | | | | | |
| PUAINEL155 | SUMINISTRO Y COLOCACION DE INTERRUPTOR TERMOMAGNETICO TIPO I-LINE, 3 POLOS DE 50 AMPER'S, MARCA SQUARED'S; INCLUYE: ACARREO, CONEXIÓN ELECTRICA, PRUEBA NECESARIAS, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 1.00 | $8,695.71 | $8,695.71 | 0.33% |
| | | | | | | |
| PUAINEL160 | SUMINISTRO Y COLOCACION DE INTERRUPTOR TERMOMAGNETICO TIPO I-LINE, 3 POLOS DE 100 AMPER'S, MARCA SQUARED'S; INCLUYE: ACARREO, CONEXIÓN ELECTRICA, PRUEBA NECESARIAS, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 1.00 | $13,806.25 | $13,806.25 | 0.52% |
| | | | | | | |
| PUAINEL1675 | SUMINISTRO Y COLOCACION DE INTERRUPTOR TERMOMAGNETICO TIPO I-LINE, 3 POLOS DE 200 AMPER'S, MARCA SQUARED'S; INCLUYE: ACARREO, CONEXIÓN ELECTRICA, PRUEBA NECESARIAS, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 1.00 | $25,772.70 | $25,772.70 | 0.98% |
| | | | | | | |
| PUAINEL202 | SUMINISTRO Y COLOCACION DE INTERRUPTOR TERMOMAGNETICO TIPO QO DE 2 POLOS 15 A 50 AMPER'S, MARCA SQUARE'D; INCLUYE: ACARREO, CONEXIÓN, PRUEBAS, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 1.00 | $843.92 | $843.92 | 0.03% |
| | | | | | | |
| PUAINEL250 | SUMINISTRO Y TENDIDO DE TUBO CONDUIT DE P.V.C. PESADO ABOCINADO DE 19 MM DIAMETRO; INCLUYE: ACARREO, EXCAVACION DE 0.20 DE ANCHO Y 0.40 M DE PROFUNDIDAD, RELLENO DE EXCAVACIONES, CAMA DE ARENA DE 8 CM DE ESPESOR, PEGADO DE TUBERIAS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M | 3.00 | $80.88 | $242.64 | 0.01% |
| | | | | | | |
| PUAINEL260 | SUMINISTRO Y TENDIDO DE TUBO CONDUIT DE P.V.C. PESADO ABOCINADO DE 25 MM DIAMETRO; INCLUYE: ACARREO, EXCAVACION DE 0.20 DE ANCHO Y 0.40 M DE PROFUNDIDAD, RELLENO DE EXCAVACIONES, CAMA DE ARENA DE 8 CM DE ESPESOR, PEGADO DE TUBERIAS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M | 86.70 | $86.39 | $7,490.01 | 0.28% |
| | | | | | | |
| PUAINEL340 | SUMINISTRO Y TENDIDO DE TUBO CONDUIT FIERRO GALVANIZADO PARED GRUESA DE 25 MM. DE DIAMETRO; INCLUYE: ACARREO, CORTES, ELEVACIONES, PIEZAS DE CONEXION, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M | 50.46 | $210.99 | $10,646.56 | 0.40% |
| PUAINEL605 | SUMINISTRO Y COLOCACION DE CABLE VINANEL XXI, 600 VOLTS, CALIBRE 12 MARCA CONDUMEX, LATINCASA, CONDUCTORES MONTERREY; INCLUYE: ACARREOS, TENDIDO, LUBRICACION, GUIAS, AISLAMIENTO DE PUNTA, CONEXIONES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M | 26.40 | $24.06 | $635.18 | 0.02% |
| PUAINEL610 | SUMINISTRO Y COLOCACION DE CABLE VINANEL XXI, 600 VOLTS, CALIBRE 10 MARCA CONDUMEX, LATINCASA, CONDUCTORES MONTERREY; INCLUYE: ACARREOS, TENDIDO, LUBRICACION, GUIAS, AISLAMIENTO DE PUNTA, CONEXIONES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M | 86.00 | $37.79 | $3,249.94 | 0.12% |
| | | | | | | |
| PUAINEL615 | SUMINISTRO Y COLOCACION DE CABLE VINANEL XXI, 600 VOLTS, CALIBRE 08 MARCA CONDUMEX, LATINCASA, CONDUCTORES MONTERREY; INCLUYE: ACARREOS, TENDIDO, LUBRICACION, GUIAS, AISLAMIENTO DE PUNTA, CONEXIONES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M | 226.32 | $63.07 | $14,274.00 | 0.54% |
| | | | | | | |
| PUAINEL689 | SUMINISTRO Y COLOCACION DE CABLE DE ALUMINIO NEUTRANEL AL-ACSR 2X6+1X6 CALIBRE 6 AWG, MARCA CONDUMEX, LATINCASA, CONDUCTORES MONTERREY, HASTA UNA ALTURA DE 15 M; INCLUYE: ACARREOS, TENDIDO, CINTA AISLANTE, AISLAMIENTO DE PUNTA, CONEXIONES, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M | 53.30 | $95.22 | $5,075.23 | 0.19% |
| | | | | | | |
| PUAINEL700 | SUMINISTRO Y COLOCACION DE CABLE DE COBRE DESNUDO CALIBRE 14, MARCA CONDUMEX, LATINCASA Y CONDUCTORES MONTERREY; INCLUYE: TENDIDO, ACARREO, GUIAS, CORTES, EMPALMES, CONEXIONES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | M | 13.20 | $11.28 | $148.90 | 0.01% |
| | | | | | | |
| PUAINEL710 | SUMINISTRO Y COLOCACION DE CABLE DE COBRE DESNUDO CALIBRE 10, MARCA CONDUMEX, LATINCASA Y CONDUCTORES MONTERREY; INCLUYE: TENDIDO, ACARREO, GUIAS, CORTES, EMPALMES, CONEXIONES, TERMINALES ELECTRICAS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | M | 43.00 | $24.06 | $1,034.58 | 0.04% |
| | | | | | | |
| PUAINEL715 | SUMINISTRO Y COLOCACION DE CABLE DE COBRE DESNUDO CALIBRE 8, MARCA CONDUMEX, LATINCASA Y CONDUCTORES MONTERREY; INCLUYE: TENDIDO, ACARREO, GUIAS, CORTES, EMPALMES, CONEXIONES, TERMINALES ELECTRICAS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | M | 113.16 | $34.37 | $3,889.31 | 0.15% |
| | | | | | | |
| PUAINEL879 | SUMINISTRO Y COLOCACION DE VARILLA COPERWELD DE 1,50 METROS X 1/2" INCLUYE: ACARREOS, HINCADO DE VARILLAS, CONECTOR MECANICO REFORZADO, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 4.00 | $270.40 | $1,081.60 | 0.04% |
| PUAINEL940 | SUMINISTRO Y COLOCACIÓN DE LUMINARIA PARA POSTE TIPO LED MCA TECNOLITE MOD. TL-120ESLED730MV65S, 120 W, 100-240V, 65K, 12,000 LM (INDUS III), CON FOTECELDA. INCLUYE: ACARREOS, ELEVACIONES, CONEXIONES ELECTRICAS, TERMINALES ELECTRICAS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | PZA | 8.00 | $2,548.13 | $20,385.04 | 0.77% |
| | | | | | | |
| PUAINEL1001 | SUMINISTRO Y COLOCACION DE REGISTRO CONDULET DE ALUMINIO SERIE 3, TIPO ( C, LB, LL, LR) DE 25 MM DE DIAMETRO, MARCA CROUSE HINDS, CON TAPA DE ALUMINIO Y EMPAQUE DE SELLO; INCLUYE: ACARREO, CONEXIONES MECANICAS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | PZA | 8.00 | $150.81 | $1,206.48 | 0.05% |
| | | | | | | |
| PUAINEL1076 | SUMINISTRO Y COLOCACIÓN DE ABRAZADERA UNICANAL DE 25 MM (1") INCLUYE: ACARREOS, ELEVACIONES, ANDAMIOS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | PZA | 47.00 | $25.44 | $1,195.68 | 0.05% |
| | | | | | | |
| PUAINEL1108 | SUMINISTRO Y COLOCACIÓN DE PERFIL UNICANAL PERFORADO DE ACERO GALVANIZADO, 4x2 CAL. 16, MARCA ARGOS, PIEZA CCON UNALONGITUD DE 20 CM, PARA SOPORTE DE TUBERIAS DE LUMINARIAS; INCLUYE: ACARREOS, CORTES, AJUSTES, TAQUETES EXPANSIVOS, PERFORACIONES, VARILLA ROSCADA DE 45 CM, TUERCAS, RONDANAS, ANDAMIOS, MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | PZA | 47.00 | $184.27 | $8,660.69 | 0.33% |
| | | | | | | |
| PUAINEL1170 | SUMINISTRO Y COLOCACIÓN DE BASE PIRAMIDAL DE CONCRETO F'c: 200 KG/CM2, DE 0.35x0.60x0.50 M., PARA RECIBIR POSTE DE LUMINARIA; INCLUYE: ACARREOS, EXCAVACION, MANIOBRAS DE COLOCACION, NIVELACION, GRÚA, MATERIALES, MANO DE OBRA, HERRAMIENTAS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | PZA | 4.00 | $2,427.99 | $9,711.96 | 0.37% |
| | | | | | | |
| PUAINEL1180 | SUMINISTRO Y COLOCACIÓN DE POSTE DE FIERRO CÓNICO CIRCULAR, DE 9.00 M. DE ALTURA CON UNA PERCHAS; INCLUYE: ACARREOS, PLACAS, ANCLAS, PLOMEO, IZAJE, FIJACION, PINTURA ANTICORROSIVA Y ESMALTE, TORNILLERIA, MATERIALES, HERRAMIENTAS, EQUIPOS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | PZA | 4.00 | $7,704.74 | $30,818.96 | 1.17% |
| | | | | | | |
| PUAINEL1190 | SUMINISTRO Y COLOCACIÓN DE BRAZO PARA POSTE DE ALUMBRADO, DE 1.20 A BASE DE TUBO NEGRO 1 1/2" Y PLACA DE 3/8"; INCLUYE: ACARREOS, SOLDADURA, DOS APLICACIONES DE PINTURA ESMALTE, UNA APLICACION DE PRIMARO ANTICORROSIVO, ELEMENTOS DE FIJACIÓN, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. | PZA | 8.00 | $411.81 | $3,294.48 | 0.13% |
| | | | | | | |
| | TOTAL, INSTALACIÓN ELÉCTRICA (OBRA EXTERIOR) | | | $189,838.53 | 7.21% | |
| | | | | | | |
| A18 | INSTALACIÓN HIDRO-SANITARIA (OBRA EXTERIOR) | | | | | |
| PUAINHI550 | SUMINISTRO Y COLOCACION DE TUBO DE PVC HIDRAULICO CEDULA 40 DE 51 MM. DE DIAMETRO, INCLUYE: ACARREO HORIZONTAL Y VERTICAL HASTA EL LUGAR DE SU UTILIZACION, TRAZO, CORTE, LIJADO, PEGADO, DESPERDICIO, COLOCACION, NIVELACION, PRUEBAS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NCESARIO PARA LA CORRECTA EJECUCION. | M | 9.82 | $157.09 | $1,542.62 | 0.06% |
| | | | | | | |
| | TOTAL, INSTALACIÓN HIDRO-SANITARIA (OBRA EXTERIOR) | | $1,542.62 | 0.06% | ||
| | | | | | | |
| A19 | PISOS Y RECUBRIMIENTOS (OBRA EXTERIOR) | | | | | |
| PUAPIRE060 | FIRME DE CONCRETO SIMPLE F'c=150 KG/CM2 DE 10 CMS. DDE ESPESOR PARA BANQUETAS Y RRAMPAS, ACABADO PULIDO OO RAYADO CON BROCHA DE PELO, LOSAS 3.06 X 2.00 METROS, JUNTAS FRIAS ACABADOS CON VOLTEADOR Y ELABORADO CON REVOLVEDORA; INCLUYE: ACARREO, NIVELACION, COLADO, CURADO, CIMBRADO, DESCIMBRADO, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M2 | 245.36 | $469.72 | $115,250.50 | 4.38% |
| | | | | | | |
| PUAPIRE120 | SUMINISTRO Y COLOCACION DE REFUERZO DE MALLA-LAC 6-6/10-10, EN PISO DE CONCRETO; INCLUYE: ACARREOS, ALAMBRE DE AMARRE, TRASLAPES, DESPERDICIOS, CORTES, AMARRES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M2 | 245.36 | $70.27 | $17,241.45 | 0.66% |
| | | | | | | |
| | TOTAL, PISOS Y RECUBRIMIENTOS (OBRA EXTERIOR) | | | $132,491.95 | 5.03% | |
| | | | | | | |
| A21 | ACABADOS (OBRA EXTERIOR) | | | | | |
| PUAACAB025 | APLANADO DE MURO CON MORTERO CEMENTO-CAL-ARENA 1:2:6 A PLOMO Y REGLA, ACABADO ESPONJEADO, ESPESOR PROMEDIO DE 2.5 CM, DE 0,00 A 3,50 M DE ALTURA; INCLUYE: REMATES, BOQUILLAS, PREPARACIÓN DE LA SUPERFICIE, PLOMEADO, ANDAMIOS, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M2 | 142.56 | $264.69 | $37,734.21 | 1.43% |
| | | | | | | |
| PUAACAB125 | SUMINISTRO Y APLICACIÓN DE PINTURA VINILICA-ACRILICA, SOLIDOS POR VOLUMEN 33%, VISCOSIDAD 95 K, 3000 CICLOS DE LAVADO, EN MUROS APLANADO ACABADO ESPONJEADO, MUROS DE TABLAROCA Y PLAFONES DE CONCRETO, A UNA ALTURA DE 0,00 A 3,50 M; INCLUYE: ACARREOS, PREPARACION DE LA SUPERFICIE, UNA APLICACION DE SELLADOR VINÍLICO 5x1, DOS APLICACIONES DE PINTURA, LIMPIEZA, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA APLICACION. | M2 | 64.32 | $111.49 | $7,171.04 | 0.27% |
| | | | | | | |
| PUAACAB155 | SUMINISTRO Y ELABORACION DE SEÑALIZACION A BASE DE PINTURA ESMALTE "ACCESO A MINUSVALIDO" DE 1.65 M. X 1.20 M. DE ACUERDO CON NORMATIVA DE PROTECCION CIVIL, EN RAMPA DE ACCESO, INCLUYE: TRAZO, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA LA CORRECTA EJECUCION. | PZA | 1.00 | $469.73 | $469.73 | 0.02% |
| | | | | | | |
| PUAACAB156 | SUMINISTRO Y ELABORACION DE SEÑALIZACION A BASE DE PINTURA ESMALTE "ACCESO A MINUSVALIDO" DE 1.50 M. X 1.55 M. DE ACUERDO CON NORMATIVA DE PROTECCION CIVIL, EN RAMPA DE ACCESO, INCLUYE: TRAZO, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA LA CORRECTA EJECUCION. | PZA | 1.00 | $552.78 | $552.78 | 0.02% |
| | | | | | | |
| PUAACAB158 | SUMINISTRO Y ELABORACION DE SEÑALIZACION A BASE DE PINTURA ESMALTE "ACCESO A MINUSVALIDO" DE 2.00 M. X 2.00 M. DDE ACUERDO CONNORMATIVA DE PROTECCION CIVIL, EN CAJONES DE ESTACIONAMIENTO, INCLUYE: TRAZO, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA LA CORRECTA EJECUCION. | PZA | 1.00 | $948.96 | $948.96 | 0.04% |
| | | | | | | |
| PUAACAB161 | SUMINISTRO Y APLICACION DE PINTURA PARA SEÑALAMIENTO VIAL, EN GUARNICIONES DE CONCRETO CON UN DESARROLLO DE 25 CMS; INCLUYE: LIMPIEZA, PREPARACION DE LA SUPERFICIE, ACARREO, DOS APLICACIONES DE PINTURA, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA APLICACION. | M | 172.10 | $68.12 | $11,723.45 | 0.45% |
| | | | | | | |
| PUAACAB165 | SUMINISTRO Y APLICACION DE PINTURA DE TRAFICO PARA SEÑALIZACION EN PAVIMENTO DE CONCRETO, EN FRANJAS DE 10 CM. DE ANCHO; INCLUYE: ACARREOS, PREPARACION DE LA SUPERFICIE, LIMPIEZA, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA LA CORRECTA EJECUCION. | M | 121.00 | $25.48 | $3,083.08 | 0.12% |
| | | | | | | |
| PUAACAB168 | SUMINISTRO Y APLICACION DE PINTURA DE TRAFICO PARA NUMERACION DE CAJONES DE ESTACIONAMIENTO, DE 60 CM. DE ALTURA; INCLUYE: ACARREOS, PREPARACION DE LA SUPERFICIE, LIMPIEZA, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA LA CORRECTA EJECUCION. | PZA | 11.00 | $98.82 | $1,087.02 | 0.04% |
| | | | | | | |
| PUAACAB675 | SUMINISTRO Y COLOCACIÓN DE TOPE PLASTICO PARA ESTACIONAMIENTO, DE 60 CM DE LARGO, 15 CM DE ANCHO Y 10 CM DE ALTO, MCA. DURMAN O SIMILAR EN CALIDAD Y COSTO, ANCLADO A CONCRETO HIDRAULICO CON DOS TORNILLOS DE 3/8X4" HEXAGONAL GALVANIZADO CON TAQUETE EXPANSIVO PARA TOPES; INCLUYE: ACARREOS, PERFORACIONES, NIVELACION, LIMPIEZA DEL AREA, ELEMENTOS DE SUJECION, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA COLOCACION. | PZA | 20.00 | $600.21 | $12,004.20 | 0.46% |
| | | | | | | |
| | TOTAL, ACABADOS ( OBRA EXTERIOR) | | | | $74,774.47 | 2.84% |
| | | | | | | |
| A24 | JARDINERIA (OBRA EXTERIOR) | | | | | |
| PUAJARD024 | SUMINISTRO Y COLOCACION DE PLANTA DE ORNATO ALOE VERA DE 25 A 30 CMS DE ALTURA APROX.; INCLUYE: ACARREO, PLANTADO, RIEGO DIARIO, HASTA LA TOTAL ADAPTACION DE LA PLANTA, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA PLANTACION. | PZA | 42.00 | $109.63 | $4,604.46 | 0.17% |
| | | | | | | |
| PUAJARD029 | SUMINISTRO Y COLOCACION DE PLANTA DE ORNATO TIPO " AGAVE PATATORUM " DE 30 A 40 CM DE ALTURA APROX.; INCLUYE: ACARREO, PLANTADO, RIEGO DIARIO, HASTA LA TOTAL ADAPTACION DE LA PLANTA, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA PLANTACION. | PZA | 42.00 | $180.55 | $7,583.10 | 0.29% |
| PUAJARD040 | SUMINISTRO Y COLOCACION DE PLANTA DE ORNATO TIPO " SANSEVERIAS" DE 50 CMS DE ALTURA APROX.; INCLUYE: ACARREO, PLANTADO, RIEGO DIARIO, HASTA LA TOTAL ADAPTACION DE LA PLANTA, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA LA CORRECTA PLANTACION. | PZA | 42.00 | $156.29 | $6,564.18 | 0.25% |
| | | | | | | |
| PUAJARD075 | SUMINISTRO Y COLOCACION EN JARDINERAS DE PIEDRA BOLA DE RIO DECORATIVA, DIFERENTES COLORES, TAMAÑO MAXIMO 2"; INCLUYE: ACARREOS, PREPARACION DEL AREA, DISTRIBUCION, MATERIALES, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA LA CORRECTA COLOCACION. | M3 | 1.60 | $882.08 | $1,411.33 | 0.05% |
| | | | | | | |
| PUAJARD095 | SUMINISTRO Y PLANTACION DE ARBOL DE ORNATO TIPO " CEDRO AMARGO " DE 3.00 M DE ALTURA APROXIMADAMENTE; INCLUYE: ACARREO, EXCAVACION, IZAJE, PLANTADO, CAMA DE ARENA, TIERRA VEGETAL, RIEGO DIARIO, HASTA LA TOTAL ADAPTACION DE LA PLANTA, HERRAMIENTAS, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA PLANTACION. | PZA | 6.00 | $3,981.10 | $23,886.60 | 0.91% |
| | | | | | | |
| | TOTAL, JARDINERIA ( OBRA EXTERIOR ) | | | | $44,049.67 | 1.67% |
| | | | | | | |
| | | | | | | |
| | | | SUBTOTAL OBRA EXTERIOR | | $804,055.89 | 30.55% |
| | | | | | | |
| | | | SUBTOTAL | | $2,631,838.35 | 100% |
| | | | I.V.A. 16.00% | | $421,094.14 | |
| | | | TOTAL | | $3,052,932.49 | |